The company has successfully executed a number of turnkey projects since inception. With the company’score competence currently concentrated on the tankage, piping and other mechanical works, it has developed in house systems to ensure that all EPC projects are effectively and efficiently managed. The constant upgrade of these systems have allowed the company to develop strong ties with subcontractors such that there is a seamless management of interfaces. Overall, we have therefore been able to meet or exceed customer expectations by handing over facilities on time & budget, and within the quality and safety tolerances applied. A couple of the projects executed have been listed for information.
A few of the large tankage contracts awarded are listed which not only show the capability of the company in large tanks but also the various locations involved.
Client | Project Title | Year | Location | Scope of Work |
---|---|---|---|---|
TAKREER/ Intecsa Industrial | NORM Handling Project BeAAT | 2014 | Ruwais, UAE | EPC of 2 no's Fire protection Water tanks & 1 no Process Water Tank |
Mina Petroleum FZE/ Gulf Petrochemical Services | Bulk Liquid storage facility, port of salalah, Oman | 2014 | Salalah, Oman | Procurement, Fabrication with free issue plate and erection of following tanks: 1.AI. Dome with AI. IFR tank: 3no. of 39.5m dia x 25.5m high and 1 no. of 33m dia x 25.5m high. 2. AI. Dome roof tank: 4 no. of 39.5m dia x 25.5m high. 3. Steel cone roof tank: 1 no.of 16m dia x 15m high & 1 no. of 6m dia x 5m high. |
Ras Gas/ Chiyoda Almana / Medgulf | Flow Assurance Project EPC-2 | 2014 | Ras Laffan, Qatar | EPC of 1 no. 28m dia x 15m ht Dome roof tank (with double bottom) |
TAKREER/ Sinopec | Construction of Oil Terminal at HFZ (EPC1) | 2013 | Hamriyah Free Zone, Sharjah | Site Erection & Testing of 3 External Floating Roof Tanks (36m dia x 22.7m ht) & Site Erection & Testing of 1 External Floating Roof Tank (22.5m dia x 15.8m ht) |
TAKREER/ Sinopec | Construction of Oil Terminal at HFZ (EPC1) | 2012 | Hamriyah Free Zone, Sharjah | Pre-Fabrication of Shell plates and angles for 16 Tanks of various sizes (Largest being 41m dia x 22m ht) |
Petroleum Development Oman/ WGCCC | Surge Tank at Marmul ‘A’ Gathering Station | 2012 | Marmul, Oman | EPC of 1 Cone Roof Tank (17.5m dia x 16m ht) |
Aegean Oil Terminal Co/ Quality International | Aegean new FO terminal | 2011-12 | Fujairah, UAE | Site Erection of 7 Nos. of 49.2m dia. x 23.25 ht. Open Roof Tanks |
Qatar Petroleum/ Black Cat Engineering | Ras Laffan Emergency and Safety College, Qatar | 2011-12 | Ras Laffan, Qatar | Site Erection of 5 Nos. of 20m dia. x 12.8 ht. Open Roof Tanks |
Qatar Petroleum/ Hassan Juma | RLC Potable Water tanks and Pumps | 2010-11 | Ras Laffan, Qatar | EPC of 2 Nos. of 34m dia. x 15.5m ht. Cone Roof Tanks |
Qatar Petroleum/ SEG | Ras Laffan Emergency and Safety College, Qatar | 2010-12 | Ras Laffan, Qatar | Supply, Fabrication, Erection & Testing of 2 Nos. Dome Roof Tanks (48m dia x 15.25m ht.) and 1 No. of Cone Roof Tank (15.24m dia. x 13m ht.) |
Abu Dhabi Polymers/ IMECO | Borouge Petrochemicals Project, UAE | 2009 | Ruwais, UAE | EPC of 1 no. of 10.6m dia x 7.2m ht. Cone roof with Internal Floating Roof Tank |
Abu Dhabi Polymers / Technicas Reunidas /VTV | Utilities, Offsite& External Connections Project, Borouge Project 2 | 2008-10 | Ruwais, UAE | Supply, pre-fabrication, erection, testing & assistance for 7 nos. of Cone Roof Tanks (Largest being 20.0m dia x 15.0m ht) and Erection of 5 nos. of Spheres of capacity upto 5000m3 |
PDO/ Dodsal Engineering | Qarn Alam Steam Project, Oman | 2008-10 | Qarn Alam, Oman | EPC of 7 nos. of Cone roof tanks;(Largest being 72.0m dia x 15.0m ht) |
PDO/ Galfar Engineering & Contracting SAOG | Al Burj Full Field Water Injection Project, Oman | 2008-10 | Al Burj, Oman | EPC of 1 no. of concentric Free Water Knock Out Tank & 1no. of Gas Floatation Tank |
Shell Qatar/ VSA/ Al Jaber | The Pearl GTL Effluent Treatment Plant, Qatar | 2007-10 | Ras laffan, Qatar | EPC of 16 nos. of Cone roof tanks. (Largest being 39.0m dia x 20.5m ht |
Sohar Aluminium/ Bechtel | Sohar Aluminium smelter Project, Oman | 2007-08 | Sohar, Oman | EPC of 5 Nos. of Fire and Potable water tanks |
PDO/ Petrofac | Harweel Clusters Phase II, Oman | 2006-08 | Harweel, Oman | EPC 3 nos. of Cone roof tanks |
PDO/ Galfar Engineering & Contracting SAOG | Harweel Clusters Phase II, Oman | 2006-08 | Harweel, Oman | EPC of 6 nos. of Cone roof tanks.(Largest being 30.0m dia x 15.0m ht) |
Pipe Co (Air BP)/ MIS | Jet Fuel Storage at HFZ & Pipe line to SIA | 2005-07 | Hamriyah Free Zone, UAE | Fabrication & Installation of 4 nos 38m dia x 19.5 m Cone roof tanks |
Qatar Petroleum / Galfar Al Misnad Engineering & Contracting WLL | 5 New Storage Tanks Projects, Qatar | 2006-09 | Messaied, Qatar | EPC of 5 Nos. of Tanks as below:59.1m dia. x 14.6m ht. Cone Roof Tank;66.0m dia. x 16.5m ht. Cone Roof Tank;66.0m dia. x 15.0m ht. Double Deck Floating Roof Tank;59.1m dia. x 15.0m ht. Open Tank, 14.0m dia. x 5.0m ht. Open Tank. |
Sohar International Urea & Chemical Industries / Mitsubishi Heavy Industries. | Sohar Fertilizer Project, Oman | 2005-07 | Sohar, Oman | EPC of 5 Nos. of Cone roof and 1 No. of Dome roof tanks (Largest being 30.0m dia x 14.6m ht) |
Qatar Petroleum/ Galfar Al Misnad Engineering & Contracting WLL | New Condensate Disposal Tank at NGL Plant, Qatar | 2005-06 | Messaied, Qatar | EPC of 1 no. of 71.6m dia. x 17.5m ht. Double Deck External Floating Roof Tank |
Oman Refinery Company/ Consolidated Contractors Company. | Isomerization& Refinery Revamp Project, Oman | 2005-06 | Muscat, Oman | EPC of 2 Nos. of Cone Roof Tanks with Internal floating roof . (30.0m dia x 16.0m ht |
Oman Refinery Company/ Gulf Petrochemical Services | Terminal Facilities Soar Pipeline at Mina Al Fahal. | 2004-05 | Muscat, Oman | EPC of 3 Nos. of Double Deck Floating Roof Tanks (60.0m dia. x 21.0m ht) |
Qatar Petroleum/ Galfar Al Misnad Engineering & Contracting WLL | Messaied Tank Farm Project, Qatar/td> | 2001-03 | Messaied, Qatar | EPC of 2 nos. of 60.02m dia. x 15.5m ht. Double Deck Floating Roof Tanks |
Arabian power Company/ Toshiba / Mitsui | Umm Al Naar Independent water and power project | 2003-05 | Umm Al Naar, UAE | EPC of 2 nos Fuel Oil Tanks of 48.0m dia x 22 m high & 2 nos Demineralized Water Tanks of 42 m dia x 19.03 m high cone roof tanks |
EPPCO/ Cylingas | Additional tankage at EPPCO Fujairah tank Farm | 2003-04 | Fujairah UAE | EPC of 1 no 36.0m dia x 23 m high Aviation Turbine fuel storage tank. |
ADNOC Distribution/ TOLEDO | Fuel Oil storage tanks & Distribution Facilities at Mina Zayed | 2001-03 | Abu Dhabi, UAE | EPC of 2 nos 25.0 m dia x 17.5m high cone roof tanks |
ADNOC FOD/ Al Habaishi Contractors Co. LLC | Additional Storage Facilities at ADIA, aviation Depot, Abu Dhabi | 1996-97 | Abu Dhabi, UAE | EPC of 4 Nos 25 m dia x 12 m high & 1 Nos 16m dia x 7 m high cone roof tanks |
SEPCOIII / TIEJUN Sohar Power Construction LLC | SOHAR IPP3 Power Plant Project | Jan, 2018 | Sohar, Oman | Procurement, Fabrication, Erection and Testing of following Tanks (5 nos) |
ORPIC / Gulf Petrochemical Services | Muscat Sohar Products Pipeline | 2017 | Muscat, Oman | Procurement, Fabrication and erection of following tanks (16 nos) |
Qatar Petroleum / Consolidated Contractors Group S.A.L.(Offshore) | HAMAD International Airport Project, Doha | 2019 (Ongoin) | Doha, Qatar | EPC of 4 nos Jet A1 Tanks of Size 66.00 Meter diameter x 20.00 Meter height Aluminium Geodesic Dome roof with Aluminium Internal Floating Roof Tank 2 Nos of Fire Water Tank of Size 48.00 Meter diameter x 16.10 Meter height internal truss supported fixed cone roof tank |
Kuwait Oil Company (KOC) | New Tanks along with Associated Facilities At GC-17 and Abduliya Pump Station | 2019 | Kuwait | EPC of 3 Nos tanks, piping, civil, E & I, painting |
ORPIC / Towell Engineering Services Co LLC | EPC of Multi Purpose Storage Tank at Sohar Industrial Port. | 2019 (Ongoing) | Sohar, Oman | EPC of 1 No of Multipurpose Storage Tank of 72 Meter Dia. X 23 Meter Height with Aluminium Geodesic Dome Roof with Double Deck Internal Floating Roof. |
ADCO / GALFAR | EPC for upgrading Buhasa Fire Fghting System and Potable Water Tanks for Buhasa Camp Accommodation Project. | 2019 (Ongoing) | Buhasa, Abu Dhabi, UAE | EPC of 1 No Fire Water Tank of Size 21.50 Meter Diameter x 19.00 Meter Height Cone Roof Tank and 1 No Potable Water Storage Tank of Size 10.00 Meter Diameter x 10.60 Meter Height Cone Roof Tank. |
TRANSNET | Reconstruction of Sparef R Tanks at TM1, Durban, SA. | 2019 (Ongoing) | Durban , RSA | EPC of 2 Nos of Sparef R Tanks of 36 Meter Diameter x 23.88 Meter Height Aluminium Geodesic Dome Roof with GRE Internal Floating Roof Tank. |